Corning Museum of Glass

Corning Museum of GlassCorning_Museum_1
Corning, Inc.
Corning, NY
Project Size 100,000 SF

Project Description:

Facility Dynamics Engineering completed design phase Cx services and is in the construction phase commissioning services for the 100,000 sf north wing addition at the Corning Museum of Glass. The project includes a new 26,000-sf, $5 million contemporary art gallery building, as well as one of the world’s largest facilities for glassblowing demonstrations and live glass design sessions.

FDE provided design phase services including peer review and production of Cx specifications. We also provided Cx of the enabling projects which were necessary to keep the museum operational during the new construction work. The construction phase services include submittal review, start-up attendance, functional testing, training and O&M reviews, and off season testing. The Cx encompassed the mechanical, electrical, lighting controls, domestic hot water, and lab gas systems.  These services will comply with the LEED Cx prerequisite and additional basis point. 

Systems Commissioned include:

  • HVAC SystemsCorning_Museum_2
    • Displacement Air Conditioning Units
    • Make-Up Air Systems
    • Variable Air Volume Units
    • Fan Coil Units
    • Clean Steam System
    • Chillers
    • Pumps
    • Domestic Water Systems
    • Compressed Air System
  • Building Automation System
  • Electrical Systems
    • Digital Lighting Controls
       