San Diego Marriott Hotel and Marina

San Diego, CA

San Diego Marriott Hotel and MarinaSan_Diego_Marriot_1
Marriott International
San Diego, CA

Project Description:

Facility Dynamics Engineering provided retro-commissioning, MEP Master Planning, and Control Migration to this 26-story, 1,417 room world class resort. Retro-commissioning services included all HVAC equipment systems (air handling units, boilers, chillers, etc) and plumbing systems. We also provided forensic engineering and retro-commissioning to a laundry waste water recovery system. Our past work led to new projects including a new chiller replacement.

The Marina Marriott is one of a number of projects we have been involved with for Marriott. The others include scoping assessments and retro-commissioning services for Starr Pass, Rancho Las Palmas, LAX Marriott and the Anaheim Marriott. The scope of services provided at these sites included scoping studies targeted at identifying opportunities for assistance with implementation to ongoing support via Marriott’s monitoring based mentoring program (MoMento). 

Systems Commissioned include:

  • HVAC Systems
    • Kitchen Make-Up Air Handling Units
    • Air Handling Systems
    • Central Hot Water Plants
    • Central Chilled Water Plants
    • Kitchen Exhaust Systems
    • General Exhaust Systems
    • Variable Air Volume Terminal Units
    • Fan Coil Units
    • Water Recovery System
    • Domestic Water Systems
  • Building Automation System
     
close (X)