Berlin Federal Corrections Facility

Berlin, NH

Berlin2Federal Bureau of Prisons
Berlin, NH
Project Size 572,000 SF

Project Description:
Facility Dynamics Engineering completed commissioning services to the new 572,000 sf, $247 million Federal Corrections Institution in Berlin, New Hampshire. The correctional facility is a medium security complex that sits on 700+ acres with 25 buildings including three general housing units, a special housing unit, a central plant, and multiple vocational, educational, administrative and food service buildings.

Systems commissioned include:

  • HVAC Systems
    • Air Handling Units (Multi-Zone CV and VAV Units)
    • Make Up Air Units
    • Fan Coil Units
    • Cabinet Unit Heaters
    • Exhaust Systems
    • Terminal Units
  • Security Systems
    • Low Voltage Systems
    • Perimeter Detection
    • Duress Systems
    • Locking Controls
    • CCTV
    • CATV
  • Electrical Systems
    • Emergency Power Systems
    • UPS
    • Transfer Systems
    • Lighting Controls
  • Plumbing Systems
close (X)