Biomedical Laboratory – Building 33 C.W. “Bill” Young Center
Bethesda, MD
National Institutes of Health
Bethesda, MD
Project Size 150,000 SF
Project Description:
Facility Dynamics Engineering performed full commissioning services for the new 150,000 sf, $182,000,000 biomedical laboratory facility. Building 33 is an Integrated Research Facility that includes BSL-3 labs, a BSL-3 Vivarium, BSL-2 lab areas, offices, conference rooms, animal quarters, a mechanical space, and a waste handling area. Our services began at schematic design and continued through the warranty phase.
Systems commissioned include:
-
HVAC Systems
-
Air Handling Units with Heat Recovery
-
Fan Coil Units
-
VAV Terminal Units
-
VAV Flow Tracking Systems
-
Unit Heaters
-
Laboratory Exhaust Systems
-
Bio-safety Cabinets
-
Fume Hoods
-
Laboratory Control Systems
-
Electrical Systems
-
Emergency Power Generator
-
Network Protectors
-
Plumbing Systems