Monticello Visitor Center and Smith History Center

Charlottesville, VA

Monticello Visitor Center and Smith History CenterMonticello_Visitor_1
The Monticello Foundation
Charlottesville, VA
Project Size 40,000 SF

Project Description:

Facility Dynamics Engineering provided commissioning services to this 40,000 sf, $43 million project. The visitor center includes a reception pavilion and an exhibition pavilion. The Smith History Center is a two-story facility with education classrooms, a multi-purpose theater, a café, museum, and garden shops. This project achieved a LEED certification by the U.S. Green Building Council.

Systems Commissioned include:

  • HVAC Systems
    • Closed Loop Geothermal Units
    • Heating and Cooling Heat Pumps
    • Water to Air Heat Pumps
    • Air Handling Units
    • Associated Terminal Units
    • Radiant Heat Panels
    • Exhaust Systems
  • Building Automation System
     
close (X)